Citizen petition & impact assessment Glynn County, Georgia October 2026 Draft for public comment

Project Tabby

A petition, and an economic, fiscal and hydrological case, for a hyperscale data center on the north end of St. Simons Island

Prepared by residents of St. Simons Island for the Glynn County Board of Commissioners, the Islands Planning Commission, the Glynn County Board of Education and the Golden Isles Development Authority.

Petition no.
SSI-DC-2026-01
Status
Open for signatures and public comment
Site
North end, St. Simons Island (Tax District 4)
Version
1.0, October 4, 2026
Evidence
159 public sources, cited inline
Concept rendering: a long, two-story data hall with tall tabby piers, bronze-finned slots and a bronze crown, reflected at golden hour in a lagoon edged with pink muhly grass, with live oaks and palmettos
Concept rendering: Project Tabby's Hall A across the old golf lagoon. Illustrative, drawn to the county's 2026 rules; not a design for a specific parcel.
$7.2M a year
New revenue for Glynn County Schools in the base case, with no new students to educate.
≈0 gal/day
Cooling water for a closed-loop campus. One median Southeast golf course applies about 130,000.
0 trucks
Heavy cargo added to Spur 25, Canal Road, the causeway or Frederica Road. It arrives by water.
$160M
Requested for island households: a home battery and ten years of internet for each.
Sign the petition Read the petition Explore the 3D model Concept deck (PDF, 5 MB)

Tabby is the oyster-shell concrete of Fort Frederica's 1730s ruins: local material, built to last.

See it first

Three exhibits worth skipping ahead for. The petition and the numbers start just below.

Contents
  1. 1. The petition
  2. 2. Summary of findings
  3. 3. Georgia precedent
  4. 4. Fiscal impact
  5. 5. Water
  6. 6. Site and acreage
  7. 7. Traffic and logistics
  8. 8. Power, solar and storms
  9. 9. Internet
  10. 10. Land for land
  11. 11. Risks
  12. 12. Questions
  13. 13. How to support
  14. Sources
  15. In 3D: how the cooling works
  16. In 3D: the whole campus
1

The petition

Petition for a North End Data Center, St. Simons Island

To the Glynn County Board of Commissioners, the Islands Planning Commission, the Glynn County Board of Education and the Golden Isles Development Authority

WHEREAS Glynn County adopted data center rules in April 2026 that require closed-loop water systems, a 50-acre minimum lot and a special use permit, and the county has not yet received a single data center proposal;1, 2

WHEREAS OpenAI's Project Camellia in Effingham County produced a land sale of about $350 million to a public development authority, $90 million passed to the county and school district over three years, an $80 million community benefits pledge and free school meals for more than 14,000 students;3, 4, 5, 6

WHEREAS St. Simons Island carries 41% of the county's property tax bill, while 13.9% of island residents are under 18;7, 8

WHEREAS the island hosts 117 holes of golf, Georgia law lets golf courses water at any hour, and a closed-loop data center uses essentially no water for cooling;9, 10, 11

WHEREAS about 36,300 vehicles a day cross the F.J. Torras Causeway, 35,300 use Spur 25 north of Canal Road, and traffic on Canal Road at the Sam's Club and Panera entrance has grown 75% since 2016;12

WHEREAS the Port of Brunswick is the busiest port in the United States for autos and heavy equipment, and it connects to the north end by water;13, 14

WHEREAS nearly four of every five Glynn County power customers lost service during Hurricane Helene;15

WHEREAS up north in Vermont, households pay their utility $55 a month for ten years to lease home batteries, and customers there are absorbing a 5.5% rate increase in a rate case that included about $113 million of grid resilience work;16, 17

NOW, THEREFORE, we, the undersigned residents, respectfully petition the public bodies named above to invite a hyperscale data center to the north end of St. Simons Island, on these conditions:

  1. Full property taxes. No abatement. If any abatement is granted, a payment in lieu of taxes that pays Glynn County Schools its full 14.9 mills from the first year.
  2. A guaranteed floor. Minimum annual payments from year one, so the island is not left waiting years for the building to reach the tax digest.
  3. A SPLOST-equivalent payment. A voluntary payment equal to the local sales taxes (LOST, SPLOST and ESPLOST) that state law exempts on data center equipment and construction materials.
  4. Closed-loop cooling. No Upper Floridan aquifer withdrawals for cooling, and reclaimed water only for any make-up.
  5. Zero heavy trucks. Heavy cargo moves by water from the Port of Brunswick. Transformers move by barge. The construction workforce parks on the mainland.
  6. The developer pays for the grid and buys it clean. All transmission, substation and grid upgrades are funded by the developer under the Public Service Commission's large-load rules, with no cost shifted to residential customers. Island households do not pay for the power company's new lines and substations, on their bills or out of pocket. Power comes through Georgia Power's Customer Identified Resource program, with solar panels on every roof and parking canopy, backup generators on renewable diesel, and no unpermitted on-site generation.
  7. An Island Resilience Package, Vermont style. A home battery (Tesla Powerwall 3 or equivalent) at every occupied island household, run the way Green Mountain Power runs Vermont's: owned and dispatched by the utility at peak hours. Vermont households pay $55 a month for theirs; here the developer pays, and island households pay nothing. The campus battery yard also backs up the north end during outages, subject to agreement with Georgia Power.
  8. Ten years of free home internet for every island household.
  9. Resident discounts negotiated with any affiliated electric vehicle or battery maker.
  10. Land for land. Before any permit is issued, the developer funds permanent protection of two acres in Glynn County, preferably on St. Simons, for every acre the campus disturbs, under a perpetual easement held by the St. Simons Land Trust, another accredited land trust or Georgia DNR, plus an endowment to care for the land. The obligation is recorded against the parcel and survives any sale, abatement or legal challenge.
  11. Dark skies and quiet. The ordinance's 75-foot height limit, screened mechanical equipment, shielded lighting and buffers of at least 200 feet.
  12. Full transparency. No nondisclosure agreements with public officials, published agreements and public hearings before any vote.
2

Summary of findings

A 100-megawatt data center on about 100 acres of the north end would become the largest taxpayer in Glynn County, use less water than the golf course it might replace, and could be supplied entirely by water without adding a single heavy truck to the island's roads. The hard parts are land and power, and this study says so.

  • Voters are skeptical, and said so. On the May 2026 primary ballot, 56.6% of Glynn Republican voters said no to data centers even if they would significantly lower property taxes, and 98.3% of Democratic voters said no to higher electric bills for data center power. The conditions in this petition are the answer to the first question, and Condition 6 is the answer to the second.18, 19
  • The model exists. Effingham County's deal with OpenAI cut the school tax rate from 18.45 to 16.45 mills and is projected to send the school district about $39 million a year by 2032.20, 21
  • Schools gain the most. In the base case, the facility pays about $11.7 million a year in property tax: $7.2 million to Glynn County Schools and $4.4 million to the county. That is roughly one full school mill, with no new students. Its assessed value alone would roughly equal that of the county's ten largest taxpayers combined.22
  • Sales tax needs a condition. Georgia exempts data center equipment from state and local sales tax, so SPLOST and ESPLOST gain little on their own. A voluntary SPLOST-equivalent payment in the base case would be worth about $30.7 million, or 82% of a full year of county SPLOST collections.23, 22
  • The golf comparison holds. A closed-loop campus uses essentially no cooling water. The island's 117 holes of golf apply on the order of 846,000 gallons a day.24, 11
  • The land is the problem. Every north-end tract larger than 100 acres is under a conservation easement, owned by the federal government, or occupied by a private club or retreat. The best ground, the Frederica–Lawrence ridge at 17 to 27 feet and outside the 1% flood zone, is a golf course.25, 26
  • The roads are full. Since 2016, traffic grew 15% on the causeway, 26% on Spur 25 and 75% on Canal Road. Under this plan, heavy cargo bypasses all of it, and daily operations add about 100 trips, or 0.3% of causeway volume.12
  • The grid needs new transmission. Two 115 kV lines from Brunswick serve the island, each sized to back up the other, and nothing larger comes within about nine miles. A 100 MW load is six to ten times the electricity used by every island household combined, so the developer must pay for new lines and a substation.27, 28, 29, 30
  • The battery idea is proven. Vermont's largest utility, Green Mountain Power, has leased Tesla batteries to homes since 2017 and now runs more than 10,000 of them as a 110 MW virtual power plant that saved its customers $11 million last year. The island version, a Powerwall 3 in each of 7,829 households, costs about $105.5 million.31
  • Solar is a gesture; clean supply is real. Panels on every roof and canopy would cover about 1 to 2% of the campus's yearly use. The clean power that matters comes through Georgia Power's Customer Identified Resource program, with batteries and renewable diesel for backup.32, 33
  • Land for land is affordable. Protecting two acres for every acre used, with an endowment, costs about $12.5 to $19 million, less than two years of the facility's property tax.
  • The resident package pencils at scale. Batteries and internet for 7,829 households cost about $160 million: 4.4% of a 100 MW project's capital cost, or 1.5% at 300 MW. Effingham's land proceeds and benefits pledge came to about 2.2% of its $20 billion project.
3

Georgia precedent: what other counties received

Effingham County is the nearest and largest example. OpenAI's affiliate bought about 1,400 acres near Rincon for a 3.2-gigawatt campus. The county's industrial development authority then used the roughly $350 million in land proceeds to fund tax relief: $90 million over three years, beginning with $21 million to the county and $9 million to the school district.3, 4 The school board cut its millage rate by two mills.20 OpenAI separately pledged $80 million in community benefits, starting with free breakfast and lunch for every student in 2026–27.5, 6 Most of the tax revenue is still ahead: projected payments to the school district rise from about $3.5 million in 2027 to about $39 million a year at full build-out in 2032.21

The deal also drew two lawsuits after officials negotiated under nondisclosure agreements: a zoning challenge filed by residents in September, and a suit by the Southern Environmental Law Center for One Hundred Miles and five residents asking a judge to void the authority's agreements with OpenAI's affiliate.34, 35, 36 The county postponed its site plan review. Condition 12 of this petition exists because of all that.

Exhibit 3.1
Georgia data center projects and what their communities received
ProjectCountyScaleWhat the community received or expects
OpenAI "Project Camellia"Effingham3.2 GW, ~1,400 acres, $20B$350M land sale to the county authority; $90M over 3 years to county and schools; school millage cut 18.45→16.45; $80M benefits pledge; projected school PILOT ~$39M/yr by 20323, 4, 20, 21
Project Sail (Prologis)Coweta900 MW, 800+ acres, $17BAbout $100M a year in projected local taxes37
Burkhalter RoadBulloch (Statesboro)Up to 99 MW, 26.9 acres, $1.2BDeveloper-funded study projects 10-year net revenue of $28.7M to the county, $26.2M to schools and $21.7M to the city38
Data center clusterDouglasGoogle, Microsoft, Switch, AWSContributions to the county general fund rose from $3.4M (2023) to $11.6M (2025), or 8% of the fund39
Amazon, CovingtonNewtonPILOT totaling $301MThe mayor proposed using it to eliminate city property taxes on homes; referendum in November 202640
Meta Stanton SpringsNewton (joint authority)$2B+, ~400 jobs2024 PILOT of $3M across four counties, of which Newton County Schools received $710,550; $5.6M+ to area schools and nonprofits41, 42
QTS FayettevilleFayette615 acres, 16 buildings$1.2M in property tax in 2025 against projections above $40M a year at completion. A caution on timing.43, 44
Projections are the developers' or counties' own and are not audited. Elsewhere, Camden and Chatham counties adopted moratoria in 2026, and Glynn County chose to adopt rules instead.45, 1

"This generous commitment from OpenAI provides immediate, practical relief for our community."

Dr. Yancy Ford, Effingham County Schools Superintendent6

"The more money projects like this one pay on property taxes to the school, the less people like you or me have to pay."

Glenn White, Floyd County Schools Superintendent46

"I don't think they are the boogeyman that everyone on the internet thinks they are."

David Bennett, Bulloch County Commission Chairman47
4

Fiscal impact

The island's tax baseline

St. Simons Island is unincorporated Tax District 4. Its 2026 rate is 24.074 mills: 14.900 for the Board of Education and 9.174 for the county, which covers the general fund plus fire, police, EMS and capital projects districts.48 Georgia assesses property at 40% of fair market value.49 In 2025 the school levy raised $109.1 million, so one school mill is worth about $7.33 million.50 The island holds 42.5% of the county's gross assessed value and pays 41.4% of the property tax billed.7

Glynn County Schools budgeted $190.7 million in revenue for FY202651 and faced a preliminary $1.67 million gap for FY2027, driven by mandated pension and health costs, new positions and step raises.52 The district serves about 12,750 students.53 On St. Simons, 37.8% of residents are 65 or older and 13.9% are under 18.8 A data center adds to the digest without adding a single student.

Method

Annual tax equals taxable fair market value × 40% × the millage rate. The uncertain input is taxable value per megawatt. Construction alone now runs about $11.3 million per MW, and AI equipment can add as much as $25 million per MW.54 Servers, however, are taxed as business personal property on a one-to-four-year economic life, and software is effectively untaxed.55 So this study uses deliberately lower taxable values taken from Georgia projects: $12.1 million per MW (Statesboro) for the conservative and base cases, and $18.9 million per MW (Project Sail) for the ambitious case.38, 37

The base case assumes no abatement. That is not wishful: in August 2026 Microsoft moved to void its own abatements in metro Atlanta to "pay our full and fair share of local property taxes."56

Exhibit 4.1
Annual property tax by scenario, St. Simons District 4 rates (24.074 mills)
ConservativeBaseAmbitious
IT capacity50 MW100 MW300 MW
Taxable value per MW$12.1M$12.1M$18.9M
Taxable fair market value$605M$1.21B$5.67B
Assessed value (40%)$242M$484M$2.27B
Abatement50% for 15 yearsNoneNone
Property tax collected per year$2.91M$11.65M$54.60M
  to Glynn County Schools (14.900)$1.80M$7.21M$33.79M
  to Glynn County (9.174)$1.11M$4.44M$20.81M
School-mill equivalent0.250.984.61
Share of school revenue (FY2026)0.9%3.8%17.7%
15-year total$43.7M$174.8M$819.0M
The conservative case doubles to $5.83M a year when its abatement ends. Figures are in today's dollars at 2026 millage, with no digest growth and no depreciation curve, and before any community benefits agreement. Inputs: millage48; school levy50; school revenue51.

What the base case means

  • For schools: $7.21 million a year is about the annual cost of educating 421 students at the district's $17,141 per-pupil spending,53 which is close to the enrollment of St. Simons Elementary (462) or Oglethorpe Point Elementary (486). It would cover the preliminary FY2027 gap more than four times over.
  • For homeowners: if the school board used it to cut the rate instead, the 0.98-mill reduction would save about $219 a year on a median-value island home ($555,600), before exemptions.8
  • For the county: $4.44 million a year for the general fund and the island's fire, police, EMS and capital projects districts.
  • For the digest: at $484 million assessed, the facility would be about 2.6 times the county's current largest taxpayer, Brunswick Cellulose ($187.2 million), and roughly equal to the ten largest taxpayers combined ($476.3 million).22

The ambitious case sends Glynn County Schools about $33.8 million a year, comparable to the roughly $39 million Effingham's schools expect from OpenAI by 2032.21

Exhibit 4.2
Annual local property tax per megawatt: Georgia benchmarks and this study
OpenAI, Effingham (2032 PILOT)$20,600
Burkhalter Road, Statesboro$77,000
Project Sail, Coweta$111,000
Project Tabby, base case$116,500
Project Tabby, ambitious case$182,000
View as table
Project$/MW/yrBasis
OpenAI, Effingham20,600$66M/yr (county + schools, 2032) ÷ 3,200 MW
Burkhalter Road, Statesboro77,000~$7.7M/yr average ÷ 99 MW
Project Sail, Coweta111,000~$100M/yr ÷ 900 MW
Project Tabby, base116,500$11.65M ÷ 100 MW
Project Tabby, ambitious182,000$54.60M ÷ 300 MW
Per-megawatt figures are this study's arithmetic on each project's published projection.21, 38, 37 Millage rates differ by county; Effingham's figure reflects a 50% abatement on a lower cost per MW.

SPLOST and ESPLOST

Glynn County's sales tax is 7%: the 4% state rate plus one cent each for LOST, ESPLOST and SPLOST.57 The 2022 SPLOST is a $170 million program running from April 2023 to March 2029, and it collected $37.6 million in FY2025, ahead of projections.58, 22 Island projects on its list include $13.99 million for the St. Simons Gateway and Torras Causeway, $2.45 million for Demere Road, $2.7 million for island sidewalks and trails, $1.75 million for Sea Island Road traffic flow and $1.0 million for a county fiber connection on St. Simons.22 The county describes the Gateway's current layout as creating "congestion and safety concerns."59

The petitioner's own analysis of county audits, state distributions and school board reports finds that revenue is not the constraint. Cost is: a highway construction cost index sits about 47% above its 2020 baseline. Under ESPLOST IV, the St. Simons Elementary addition grew from a $25.5 million budget to $33.7 million, and the Oglethorpe Point renovation from $6.5 million to $7.25 million.60, 61 ESPLOST collected about $36.6 million in FY2024.60

What this study will not claim Georgia's data center exemption covers state and local sales tax on qualifying equipment and construction materials. Its local cost statewide is estimated at $530 million in FY2026.23, 62 The exemption runs through 2031.63 A data center therefore adds little to SPLOST or ESPLOST unless it agrees to pay. ESPLOST is also capped by referendum (ESPLOST V: $114.6 million)64, and ESPLOST money cannot pay salaries.65 The school property tax is the main event.
Exhibit 4.3
Condition 3: the SPLOST-equivalent payment (illustrative, one-time at initial build)
Base, 100 MWAmbitious, 300 MW
Capital cost ($11.3M/MW construction + $25M/MW AI equipment)$3.63B$10.89B
Taxable purchases (half of construction + all equipment)$3.07B$9.20B
One cent (SPLOST-equivalent)$30.7M$92.0M
As a share of one year of county SPLOST ($37.6M)82%245%
All three local cents (LOST + ESPLOST + SPLOST)$92.0M$275.9M
Equipment refreshes every few years would repeat a share of this. Cost inputs54; SPLOST collections22. Construction would also support roughly 5,400 construction jobs at Georgia's rate of 4.75 per $1 million and an average wage near $78,000; a typical hyperscale facility employs about 50 people when running.23

Assumptions and sensitivities

  • Taxable value per MW is the largest uncertainty. It could run higher with GPUs on the rolls or lower if servers depreciate faster than assumed.
  • Any abatement would be negotiated through the Golden Isles Development Authority's bond-for-title process, which it describes as "weighted to give the most benefit in the beginning years."66 The authority's policy also requires 25 new jobs,67 and so does the state sales tax exemption in a county of Glynn's size.23
  • Revenue arrives late without a floor. Fayette County collected $1.2 million from QTS in 2025, years into construction.43 Condition 2 addresses this.
  • The school digest grew about 6.5% on reassessment in 2026, judging by the rollback rate of 13.99 mills,68 and in 2025 Glynn voters capped annual assessment increases on homesteads for school taxes at inflation.69 New commercial value is worth relatively more to the schools as a result.
5

Water: the golf course benchmark

St. Simons Island has 117 holes of golf. Georgia's outdoor watering rules allow "irrigation of athletic fields, golf courses, or public turf grass recreational areas" at any hour of the day.10

The median golf facility in the Southeast applied 145.8 acre-feet of water in 2024, about 130,000 gallons a day across 90.9 irrigated acres.24 Nationally, golf applied 1.63 million acre-feet (531.8 billion gallons) in 2024. All U.S. data centers consumed 17.4 billion gallons on site in 2023,70 so golf used about 30 times as much. One analyst put it this way: "This is 3% of the water consumed by the American golf industry."71

Exhibit 5.1
Golf on St. Simons Island
CourseHolesLocationAccess
King and Prince Golf Club (Hampton Plantation)18North endReopening late November 2026 as a private club; new members pay $45,000–$55,000 to join72
Frederica Golf Club18North end, near Fort FredericaPrivate; course on 300+ acres73
Sea Palms Golf & Tennis Resort27Mid-islandResort, open to the public74
Sea Island Golf Club: Seaside18South end (Retreat)Resort; host of the RSM Classic75
Sea Island Golf Club: Plantation18South end (Retreat)Resort75
Sea Island Golf Club: Retreat (formerly St. Simons Island Club)18South endResort75
Total on St. Simons Island117Ocean Forest, on Sea Island proper, adds 18 more.
Exhibit 5.2
Daily on-site water use, gallons per day
100 MW data center, first-generation evaporative design not proposed1,458,230
All 117 golf holes on St. Simons (illustrative)846,000
One north-end club's groundwater permit, annual average550,000
100 MW, evaporative cooling at the U.S. average228,245
One median Southeast golf course130,162
100 MW, mostly dry cooling with occasional misting126,803
Project Tabby: 100 MW closed loop, as Glynn's ordinance requires≈ 0 for cooling
View as table
Facilitygal/dayBasis
100 MW, first-generation evaporative1,458,2302.3 L/kWh76
117 golf holes on St. Simons~846,0006.5 × 145.8 af/yr24
North-end club groundwater permit550,000EPD permit 063-0044, annual average77
100 MW, evaporative, U.S. average228,2450.36 L/kWh70
Median Southeast golf facility130,162145.8 af/yr24
100 MW, mostly dry126,8030.2 L/kWh70
100 MW closed loop≈0 (cooling)Loop filled once at construction11
Data center rows assume 100 MW of IT load running at full load around the clock (2.4 million kWh a day), which overstates real use. Golf figures are annual averages; summer days run higher. 1 acre-foot = 325,851 gallons.

The aquifer under the island

The Joint Water and Sewer Commission draws the island's drinking water from the Upper Floridan aquifer through wells 750 to 1,050 feet deep.78 The U.S. Geological Survey reports that "the Upper Floridan aquifer is contaminated with saltwater in a 2-square-mile area of downtown Brunswick."79 State rules for Glynn County bar new wells in a buffer around that plume and require conservation and reuse.80 Golf courses have already helped: USGS credits part of the county's drop in Upper Floridan pumping to "reduced usage by golf courses in Glynn County, which have shifted withdrawals to wells completed in the Brunswick aquifer system."79

Condition 4 asks for the design Microsoft introduced in 2024, where the cooling loop is filled once during construction and recirculates without evaporation. Microsoft estimates it avoids more than 125 million liters a year per data center.11 For scale, the Brunswick pulp mill's draft permit allows 45 million gallons a day.81 In Memphis, xAI committed to an $80 million plant that would recycle 13 million gallons of wastewater a day for cooling. That project is paused until 2027.82

Exhibit 5.3
How a closed-loop hall works
Exploded cutaway of four bays of a data hall: the roof lifted to show solar panels and dry coolers, two floors of racks, blue and copper pipes of a sealed cooling loop rising to the roof, and tabby wall panels pulled away
Full screen
  1. Solar on every roof
  2. Dry coolers release heat to the air, with no evaporation
  3. Sealed loop: supply in blue, return in copper
  4. Two floors of server racks
  5. Bronze crown hides the roof plant
  6. Tabby skin with bronze-finned slots
  7. Raised plinth
Illustrative cutaway of four of a hall's 24 bays, made for this study. Heat leaves the racks in water and glycol, rises to the roof and is released to the air, like a car radiator. The loop is filled once. The 3D version opens the hall up and runs the loop: outside, inside, out the roof.
The caveat golfers will raise Golf's "applied" water is not identical to a cooling tower's "consumed" water, since some irrigation soaks back into shallow ground. Counting the water used off-site at power plants, a 100 MW facility's total footprint runs about 3.4 to 4.0 million gallons a day, almost none of it drawn from the island.70
6

Site and acreage

How much land does this take? Roughly one acre per megawatt, and never less than 50 acres in Glynn County.

Glynn's 2026 ordinance sets a 50-acre minimum lot, a 75-foot height limit and 50-foot setbacks, with buffers of 200 to 500 feet generally recommended.1 Large campuses vary widely. QTS Fayetteville spreads 16 buildings over 615 acres, while OpenAI's Stargate sites pack about 1.4 megawatts per acre in Abilene (1.2 GW on 875 acres) and 1.7 in Shackelford County.44, 83, 84 A 100 MW building needs roughly 490,000 square feet of floor area. The 75-foot limit allows two stories, which halves the footprint.

Exhibit 6.1
Land needed by size of facility
IT capacityFloor areaCampus landShare of island land
50 MW (conservative)~245,000 sq ft50 acres (county minimum)0.5%
100 MW (base)~490,000 sq ft60–250 acres; plan on ~1000.9%
300 MW (ambitious)~1.5M sq ft180–750 acres; plan on ~3002.8%
1.2 GW (Stargate Abilene, for scale)~4M sq ft875 acres8.3%
Island land area: 16.48 square miles, about 10,547 acres.8 Floor area assumes about 4,900 square feet per MW, from Abilene's first phase (more than 200 MW in 980,000 square feet).83

Screening the north end

North of the Frederica Road and Lawrence Road roundabout, the study screened every tract that is large, protected, or for sale. The north end is mostly marsh and is largely in FEMA's 1% flood zone. Its uplands, however, include the island's highest ground: the Frederica–Lawrence ridge at 17 to 27 feet, mostly in Zone X.25 The north end is zoned Forest Agricultural. The only industrial zoning anywhere on the island is a 1.4-acre lot at a substation, so any site would need rezoning through the Islands Planning Commission and the Board of Commissioners.85, 86, 87

Exhibit 6.2
North-end site screening
SiteAcresStatusVerdict
Cannon's Point Preserve700+Perpetual conservation easement held by The Nature Conservancy26Excluded
Guale Preserve (former Musgrove land)258Perpetual easement held by Georgia DNR88Excluded
Fort Frederica National Monument~284–305National Park Service. We checked: it would take an Act of Congress.89Excluded
Other Land Trust tracts (Oatland, Sinclair, Spears)15–70 eachProtectedExcluded
Frederica Golf Club300+Active private club on the highest ground of the north end73, 25Concept A
King and Prince Golf Club~153 uplandNewly redesigned; reopening private in November 2026; partly in flood zone AE72, 25Concept A, alternate
Musgrove remainder~210 uplandPrivate retreat; no sale activity found; easement status unknown90Concept C
Lawrence Road tract beside the north-end substation~23–30Entitled residential; about 18 feet, Zone X91, 25Concept B
Hampton River marina areasmallFlood zone VE (coastal high hazard)25Excluded
Acreages from owners' published figures and Glynn County parcel data; the King and Prince course sits inside a 1,171-acre parcel that is mostly marsh.92 No landowner has been contacted, and none has expressed interest in selling.
Preferred concept

A. The Fairway Conversion

About 100 acres of an existing north-end course, on the Frederica–Lawrence ridge, become a 100 MW closed-loop campus. The site trades irrigated turf for a building that uses essentially no cooling water.

Size
100 MW on ~100 acres
Ground
17–27 ft, Zone X
Water
Net reduction of roughly one golf course
Needs
A willing seller and rezoning
Pilot

B. The Substation Edge Pilot

A 20 to 30 MW edge facility on the Lawrence Road tract next to the existing north-end substation, the only power anchor on that end of the island.

Size
20–30 MW on ~25 acres
Ground
~18 ft, Zone X
Needs
A variance from the 50-acre minimum
Long shot

C. The Retreat Remainder

The largest north-end tract that is not known to be under a conservation easement. Large enough for 100 MW with generous buffers.

Size
~210 upland acres
Status
Private retreat; not for sale
Needs
A willing seller and rezoning
Exhibit 6.3
Concept design: what Concept A could look like
Concept rendering, aerial view: two long tabby data halls with solar roofs in a clearing of live oaks and pines, with a pavilion, a lagoon, solar-canopy parking, a battery yard and a substation, and salt marsh to the west
Full screen
  1. Hall A: data hall, two floors
  2. Hall B: data hall, two floors
  3. The Tabby Gallery: visitor and admin pavilion
  4. Golf lagoon, kept for stormwater
  5. Solar canopies over the parking
  6. Battery yard behind tabby walls
  7. Substation, paid for by the developer
  8. Boardwalk onto the marsh
Concept rendering of the west facade: tall tabby piers, bronze-finned slots, a bronze crown and a deep cypress soffit, with a covered walkway to the entrance
Tabby-finish piers, bronze-finned slots and a bronze crown that hides the rooftop coolers.
Concept rendering at dusk: a marsh boardwalk with low rail lights leading to a glowing glass pavilion, with the dark, windowless hall behind
After dark: no windows in the halls and only low, shielded path lights.
Concept site plan rendered from above: two halls with solar roofs and a service yard between them, the pavilion and lagoon to the south-west, solar parking, the battery yard and substation, forest around and marsh to the west
Site plan from above. About 15 acres built; the rest stays forest.
Concept rendering: a barge with a large power transformer at a river landing below a wooded bluff, with a tug and a hovercraft carrying server racks
Heavy loads arrive by water. See section 7.
West elevation of Hall A: a 216-meter colonnade of tabby piers with bronze-finned slots, 62 feet tall, with live oaks and pines behind
West elevation of Hall A, to scale: 216 meters long and 62 feet tall, 13 feet under the county's 75-foot limit.
Renderings made for this study in Blender from one to-scale model: two halls of 216 by 53 meters on a generic north-end ridge, with marsh, live oaks, pines and palmettos. Illustrative only. No landowner has been contacted. You can orbit the whole campus in 3D, and the full 20-slide concept deck is a PDF download (5 MB).
7

Traffic and logistics

Anyone who has sat at the Spur 25 light by Sam's Club and Panera knows the numbers before reading them.

From I-95, island-bound traffic takes Exit 38 onto Spur 25 (the Golden Isles Parkway), passes the Canal Road signal at the Canal Crossing shopping center, crosses US 17 at L Street and rides the F.J. Torras Causeway, the only road onto the island. Georgia DOT counts every link.12

Exhibit 7.1
Average daily traffic, 2016 and 2025
20162025Scale: 0 to 40,000 vehicles a day
F.J. Torras Causeway36,300 +15%
Spur 25, north of Canal Road35,300 +26%
Canal Road at Canal Crossing (Sam's Club, Panera)11,800 +75%
Frederica Road, north end9,850 +18%
View as table
Road (GDOT station)20162025ChangeGDOT future
F.J. Torras Causeway (127-0278)31,50036,300+15%45,700
Spur 25 N of Canal Rd (127-0327)28,10035,300+26%48,900
Canal Rd at Canal Crossing (127-0616)6,75011,800+75%24,300
Frederica Rd N of S. Harrington (127-0289)8,3509,850+18%13,400
Annual average daily traffic from GDOT's TADA counters; some years are GDOT estimates between counts.12 The south sections of Frederica Road carry 14,200 to 14,900 a day.

What residents are saying

A review of the public Golden Isles News & Views Facebook group on October 4, 2026 found the same complaints again and again. They are summarized here without names.93

  • The causeway signals. One post described lights set to about 20 seconds per side and waits of 10 to 15 minutes, and argued that one causeway can't serve the island forever. It drew more than 220 comments.
  • US 17 at L Street. Drivers report that the green toward the causeway passes about three cars before turning yellow.
  • Altama Connector at Spur 25 (the Home Depot intersection). A post reported that GDOT's district engineer is studying a reconfiguration after years of complaints. A separate post described a signal outage there, with officers directing heavy traffic. The county already rebuilt part of the intersection in 2022 to add lanes across the Spur.94
  • Roundabouts. A new roundabout at Spur 25 and GA 99, which The Brunswick News described as one of the most dangerous intersections in Glynn County, would be the fifth between US 17 and US 341 by one resident's count.95
  • Canal Road. Crashes at Canal and Old Jesup back traffic up, and residents ask for a bike path because people walk in the grass beside heavy traffic.
  • A causeway toll. A proposal to bring back a toll booth drew 140 comments.

The zero-truck logistics plan

The Port of Brunswick handled 779,000 autos and more than 53,000 units of heavy machinery in 2025, the most of any U.S. port for the second year running.13 A private contractor there operates a barge-mounted crane rated at 500 short tons.96 From the Brunswick waterfront, the Intracoastal Waterway runs about 17 statute miles down the Brunswick River, across St. Simons Sound and up the Mackay River to the north end, passing under the 65-foot Torras Causeway bridge.14

The alternative is the road. The Department of Energy describes how a large power transformer travels by highway: "The transport modular shown is 70 feet long with 12 axles and 192 wheels, and occupies two lanes of traffic."97 Picture that at the Canal Road light on a Saturday in July.

Exhibit 7.2
Two ways to the north end (schematic, not to scale)
Water route versus road route to the north end The water route runs from Colonel's Island Terminal through the Brunswick River, St. Simons Sound and the Mackay River to a north-end landing, about 17 statute miles with no traffic signals. The road route runs from I-95 Exit 38 along Spur 25 past the Canal Road signal, through US 17 at L Street, across the Torras Causeway and up Frederica Road. Under Condition 5, heavy cargo uses only the water route. WATER ROUTE: ALL HEAVY CARGO Port of Brunswick Colonel's Island Terminal Brunswick River St. Simons Sound ICW mile 679.4 Mackay River Under causeway bridge, 65 ft North-end landing ICW mile 665.8 About 17 statute miles · LCAC about 22 minutes at 40 knots · no traffic signals ROAD ROUTE: NOT USED FOR HEAVY CARGO I-95 Exit 38 Spur 25 35,300 a day Canal Rd signal Sam's Club, Panera US 17 at L St "about three cars" Torras Causeway 36,300 a day Frederica Rd 9,850 a day, north end
Water distances from NOAA's Coast Pilot.14 The Frederica River's 4.4-foot controlling depth and 9-foot bridge clearance rule it out for barges, so the plan uses the Mackay River.98 A north-end landing would need state marsh and federal permits.
Exhibit 7.3
Moving 1,000 AI server racks (3,000 lb each) and the transformers
CraftPayloadTrips for 1,000 racksCarries a 100–400 ton transformer?
U.S. Navy LCAC hovercraft9960 tons (75 overload)20–25No
Ship-to-Shore Connector hovercraft10074 tons21No
Griffon Hoverwork BHT (civilian)10118–21 tonnes67–77No
CH-53K King Stallion helicopter102, 10327,000 lb rated; 36,000 lb demonstrated84–112No
Erickson S-64F Air-Crane (civilian)10425,000 lb125No
Barge, loaded by Brunswick's 500-short-ton crane96500 short tons (crane)n/aYes
Rack weight: NVIDIA GB200 NVL72, about 3,000 lb and 120 kW each.105 Large power transformers weigh 100 to 400 tons.97 Trip counts are limited by weight only. One week of hovercraft runs moves the racks; the transformers go by barge.

People, not cargo. The construction workforce would park on the mainland and ride crew boats or shuttles. Once running, a facility of this kind employs about 50 people,23 or roughly 100 trips a day, about 0.3% of causeway traffic.

Does the port help SpaceX?

Some have asked whether the Port of Brunswick also benefits SpaceX, which acquired xAI in February 2026.106 It is a fair question. Brunswick has a 185-foot bridge, a 500-ton barge crane and the busiest ro-ro terminal in the country.98, 96, 13 Unfortunately, the FAA's environmental review says SpaceX will barge its Starship hardware from Brownsville, Texas, to Cape Canaveral,107 and Brunswick sits 195 nautical miles past that stop.108

Georgia offered SpaceX free land in Camden County in 2013, and SpaceX chose Texas.109 Camden voters later stopped a county spaceport land deal by about 72%, a vote the Georgia Supreme Court upheld.110 SpaceX's Georgia footprint, as far as we can find, is a Starlink ground station in Appling County, licensed through 2039.111 The petitioners therefore propose the north end not as a spaceport but as a second ground station, since the first one is only 60 miles inland.

Exhibit 7.4
Heavy loads by water, not by Frederica Road
Concept rendering: a barge carrying a large power transformer moored at a river landing below a wooded bluff, a tug alongside and a hovercraft loaded with server racks crossing the river
Concept rendering. Transformers of 100 to 400 tons come by barge; racks could come by hovercraft, about 20 to 25 trips per 1,000 racks. The landing and haul road stay inside the campus, so Spur 25, Canal Road, the causeway and Frederica Road see none of it.
8

Power, solar and storms

The grid today

Georgia Power's regional transmission plans name two 115 kV lines serving the island from Brunswick, the Brunswick–St. Simons line and the Brunswick–East Beach line. Each is the backup for the other.27, 28 Public maps show them on a single corridor along the causeway, feeding four distribution substations on the island, one of them on the north end near Lawrence Road.112, 29 The nearest 230 kV line is about nine miles away on the mainland, and the nearest 500 kV substation about 17 miles.29 By this study's estimate (7,121 households at about 1,000 kWh a month), island households draw about 10 to 15 megawatts on average. A 100 MW facility would draw six to ten times that.

The Public Service Commission's January 2025 rule lets Georgia Power bill customers above 100 MW on their own terms, with contracts up to 15 years, minimum bills and commission review. PSC Chairman Jason Shaw: "The amount of energy these new industries consume is staggering."30 Georgia Power's projected need for new generation grew from 400 MW in 2022 to 8,500 MW by 2025.113 In approving the Effingham contract, PSC staff added safeguards that bar Georgia Power from recovering lost revenue from residential and small-business customers.114, 115

In Memphis, xAI paid for the transmission upgrades and new substations that serve its Colossus supercomputer, and it backs the site with 150 MW of Tesla Megapack batteries.116, 117 The same project ran dozens of gas turbines without permits, which environmental groups challenged.118 Condition 6 adopts the first part of that record and rules out the second.

Exhibit 8.1
Recent storms and the island
StormYearEvacuationPeak outage
Matthew2016Mandatory east of I-95; barrier islands closed119, 120About 46,000 Glynn residents; restored in about four days120, 121
Irma2017Mandatory for all of Glynn County; causeway flooded; "major flooding occurred in St. Simon's Island"122, 123About 36,000 without power in Glynn and Brunswick on Sept. 11; only 45% of sewer pump stations working three days later124, 125
Dorian2019Mandatory east of I-95126—
Idalia2023None foundMore than 11,600 Glynn customers127
Helene2024None foundNearly 80% of Glynn customers; 36,441 in Georgia Power's Brunswick area15, 128

The Vermont model

The home battery idea comes from Vermont. Green Mountain Power, the state's largest utility, began putting Tesla Powerwalls in customers' homes in 2017.31 Today it owns the batteries, leases two to a household for $55 a month over ten years (or $5,500 up front) and uses them at peak hours.16 State regulators found that the program benefits all customers, while noting that it carries financial risk.129 By July 2026 more than 5,000 customers had over 10,000 batteries, part of a 110 MW virtual power plant. GMP says the fleet saved customers $6 million in a single heat-wave hour that month and $11 million the year before.31 In a 2018 storm, 438 Powerwalls switched on and averaged 13 hours of backup.130

Others have followed. In Austin, the city utility pays Base Power only for battery capacity, while customers pay $695 to install and $19 a month.131 In California, Google is paying for a PG&E program that enrolls existing home batteries and thermostats.132 Georgia Power's own solar-plus-storage pilot, approved in 2025 at 50 MW, proposed paying $750 per kilowatt to customers who give it control of their battery.133 Condition 7 asks for the same thing at island scale, with the data center paying the household's share.

A Tesla Powerwall 3 stores 13.5 kWh, delivers 11.5 kW continuously, and costs about $13,473 installed.134 The 30% federal tax credit for home batteries ended for systems installed after 2025.135 The island has 7,829 households.136

Exhibit 8.2
Cost of the resident package (Conditions 7 and 8)
ItemPer household7,829 households
Powerwall 3, installed$13,473$105.5M
Ten years of internet (Starlink, 100 Mbps at $55 a month, plus a $349 kit)$6,949$54.4M
Resident EV and battery discounts$0$0
Total$20,422$159.9M
As a share of capital cost: 100 MW / 300 MW4.4% / 1.5%
The discount line is priced at zero because Tesla is a separate public company and nothing here binds it. Covering all 11,233 housing units, including vacant and seasonal homes, would raise the total to about $229 million.136 Internet pricing137.

Together the batteries would hold about 106 MWh and could deliver 90 MW, about 80% of Vermont's entire virtual power plant. At its full 11.5 kW output, one battery lasts about 1.2 hours, so real outage endurance depends on keeping loads modest and on rooftop solar. A Megapack 3 holds 5 MWh,138 so a campus battery yard of a few dozen units could carry the north end through the first hours of an outage, if Georgia Power agrees to the arrangement.139

Solar on every roof

Condition 6 puts panels on every roof and parking canopy. The honest result is small. The federal PVWatts model gives a low-slope roof on St. Simons about 1,467 kWh per kilowatt of panels each year.32 The largest rooftop array on any U.S. data center, Iron Mountain's in New Jersey, is 7.2 MW.140

Exhibit 8.3
What solar can and cannot do here
SurfacePanelsEnergy a yearShare of campus use
Campus roofs (245,000–490,000 sq ft)1.0–4.4 MW1.5–6.5 GWh0.2–0.7%
Roofs plus canopies over 10 acres3.8–9.4 MW5.8–13.8 GWh0.7–2.0%
7–8 kW on each of 7,829 island homes55–63 MW77–88 GWh9–10%, none at night
Campus use assumed at 876 GWh a year (100 MW at full load); roofs and canopies cover two to six days of operation. Home systems would cost about $135–250 million at current prices, and the federal credit has expired.32, 141, 135

Cleaner supply and backup

The options that matter are less photogenic. In April 2026 the Public Service Commission approved Georgia Power's Customer Identified Resource program, which lets large customers bring up to 3 gigawatts of their own clean resources through 2035.33 Plant Vogtle's Units 3 and 4, in service since 2023 and 2024, add about 2,234 megawatts of carbon-free power to the same grid.142 For backup, Microsoft has set a goal of ending its reliance on diesel by 2030, and Digital Realty already runs generators on renewable diesel at three U.S. sites.143, 144 Offshore wind is not an option, because there are no lease areas off Georgia.145 A floating nuclear plant in St. Simons Sound remains available to anyone willing to be the first to propose one in U.S. waters.146

9

Internet

Access is not the problem. The FCC's broadband map counts 10,525 homes and businesses on St. Simons and shows fiber reported available at essentially all of them, cable at nearly 99%, and wired service of at least 100 Mbps everywhere. Those are providers' claims of availability, not subscriptions.147 Condition 8 is about the bill: ten years of home service for every household costs about $54.4 million at Starlink's 100 Mbps price.137

There is a convenient corporate fact here. SpaceX, which operates Starlink, acquired xAI in February 2026.106 xAI built its first Colossus cluster, with 100,000 GPUs, in 122 days.148 A single company could in principle build the data center, run the internet service and launch the satellites. We have not asked it.

Precedents are smaller. Microsoft paid $125,000 for free public Wi-Fi in downtown Clarksville, Virginia, near its data centers.149 Meta has given more than $5.6 million to schools and nonprofits around Stanton Springs.42 In Memphis, xAI donated upgrades at four schools, and the city proposed reinvesting a quarter of xAI's city property tax within five miles of the site.150, 151 This study found no example of a developer providing free home internet to every household in a host community. St. Simons would be the first.

SPLOST 2022 already budgets $1.0 million for a county fiber connection on St. Simons.22

10

Land for land

Keeping the Golden Isles beautiful is a line item, and a small one.

The St. Simons Land Trust has protected about 1,400 acres since 2000, roughly 14% of the island, and holds easements on about 137 more.152 It reported $2.2 million in revenue and $1.2 million in expenses in 2024.153 Its Canopy Campaign raised money to protect the Sinclair and Oatland tracts along Lawrence Road.154 The campus in this study would use about 100 acres.

Condition 10 asks the developer to fund permanent protection of two acres for every acre it disturbs, plus an endowment to care for them. Microsoft says it already protects about 1.4 acres for every acre it uses.155 In Georgia, QTS is funding a 132-acre forest restoration at Towaliga Preserve,156 and Google paid $1 million to protect 35 acres of wetlands in the Flint River watershed.157

Exhibit 10.1
What a land pledge costs
OptionAcresCost
Acre for acre100$4.1–7.3M
Two for one200$8.2–14.6M
Stewardship endowment for 200 acres ($21,700 an acre)$4.3M
Two for one, plus endowment (Condition 10)200$12.5–18.9M
As a share of base-case capital cost ($3.63B)0.35–0.52%
In months of base-case property tax13–20 months
Land priced at $41,000–$73,000 an acre, from north-end sales in 2016–2021.90, 91 The endowment capitalizes the Land Trust's 2024 operating cost per acre at a 4% draw.153 Large unprotected tracts are scarce on the north end, so land elsewhere in Glynn County, or cash paid into the Trust's acquisition fund, would count.
What this study will not claim The Land Trust has not been asked about this petition, and nothing here speaks for it. Whether the county could require a land gift as a zoning condition is a legal question; a voluntary community benefits agreement is the cleaner route.
11

Risks and mitigations

Exhibit 11.1
What could go wrong, and what this petition requires
RiskWhat the record showsRequirement
Public opinionIn the May 2026 primary, 56.6% of Republican voters rejected data centers even with lower property taxes (5,317 to 4,071)18Conditions that go beyond tax relief; full public hearings (Condition 12)
No qualifying siteEvery north-end tract over 100 acres is protected, federal, or a private club or retreat. Nothing large enough is for sale.Willing sellers only; rezoning through public IPC and BOC hearings
Grid capacityTwo 115 kV lines on one causeway corridor, nothing larger within about nine miles; 100 MW is six to ten times household demand27, 29Developer-funded transmission and substation (Condition 6)
Flood and surgeMost north-end land is in the 1% flood zone; the ridge is not25Build on the ridge only; critical equipment above base flood elevation
AquiferBrunswick saltwater plume; no new wells in its buffer79, 80Closed loop; reclaimed water only (Condition 4)
Air qualityUnpermitted gas turbines at xAI's Memphis sites118Batteries first; no unpermitted generation
Revenue arrives lateQTS paid $1.2M in 2025 against $40M+ projected43Minimum annual payments from year one (Condition 2)
SecrecyEffingham's deal ran under NDAs and drew lawsuits34No NDAs with officials; public hearings (Condition 12)
RatepayersU.S. Sen. Raphael Warnock warns communities "find themselves in a race to the bottom"158PSC large-load terms and residential protections
Noise and lightChillers, transformers and backup generators run around the clockScreening, shielded lighting, 200+ ft buffers, 75 ft height limit (Condition 11)
HistoryFort Frederica; shell middens at Cannon's Point dated to about 2500 BCE26Protected and archaeological sites excluded
12

Questions

Is this serious?
Every number on this page has a source. The hovercraft has a published payload rating.
Didn't voters already say no?
Some did. On the May 2026 Republican primary ballot, the question was whether voters would support data centers that significantly lowered their property taxes; 56.6% said no. Democratic voters were asked whether their electric bills should rise to support data center power, and 98.3% said no, which is why Condition 6 exists.18, 19 This petition asks for a great deal more than lower taxes.
Why the north end instead of the mainland?
The north end has the island's highest ground, an existing substation, and direct water access to the port. The mainland is welcome to file its own petition, though Spur 25 already carries 35,300 vehicles a day.
Won't it drain the aquifer?
Not with a closed loop, which the county's ordinance already requires. Section 5 compares it with the golf courses.
Is anyone proposing to close a golf course?
This petition doesn't ask anyone to close anything. It notes that about 100 acres of fairway could host about 100 megawatts and would use less water doing it.
Isn't the King and Prince course going private?
Yes. New members will pay $45,000 to $55,000 to join.72 Under this proposal, every household's backup battery is free.
Will Elon Musk build it?
We have not asked him. In 2025 Musk confirmed that xAI was buying an overseas power plant to ship to the United States,159 so a barge up the Mackay River is within his demonstrated range.
Is the port good for SpaceX?
Mostly no. Brunswick is 195 nautical miles past the stop where SpaceX plans to unload its rockets. Section 7 has the details.108
Does the Land Trust support this?
We have not asked it, and nothing here speaks for it. Condition 10 simply pays for the kind of work it already does.
Will my power bill go up?
The Public Service Commission's large-load rules and the Effingham safeguards exist to prevent that. Condition 6 asks for the same protections. Up north, Vermont households lease their batteries for $55 a month and are paying a 5.5% rate increase for grid work; Conditions 6 and 7 put both costs on the developer.
What happens in a hurricane?
Data centers are built to keep running when the grid goes down. This petition asks that some of that backup power reach the neighbors.
13

How to support

Sign

Add your name on the petition form. It takes a minute, asks for no email, and lists your name publicly only if you say so.

Sign the petition

Share

Copy the petition text and post it to your neighborhood group or send it to a commissioner, with the concept deck attached.

Concept deck (PDF)

Show up

Speak during public comment at the Islands Planning Commission, which next meets October 20, 2026, or at a Board of Commissioners meeting.87

§

Sources

Numbers in the text link here. Figures marked as calculations are this study's arithmetic on the cited inputs. All web sources were accessed between August and October 2026.

  1. The Current. Glynn County rejects data center moratorium despite community pushback. Apr 15, 2026.
  2. Glynn County. Board of Commissioners approves final subdivision regulations and zoning ordinance rewrites. Apr 2026.
  3. The Current. Effingham promises homeowner tax breaks from part of OpenAI windfall, but there's millions left. Aug 28, 2026.
  4. Effingham Herald. Effingham Industrial Authority approves OpenAI tax relief, $90M deal. Aug 31, 2026.
  5. The Current. $20 billion OpenAI data center to open in Effingham County. Jul 22, 2026.
  6. Effingham Herald. OpenAI will pay $4.8M for Effingham school meals. 2026.
  7. Glynn County Tax Commissioner. 2025 Digest Info Pack. Mar 2026.
  8. U.S. Census Bureau. QuickFacts: St. Simons CDP and Glynn County. accessed Oct 4, 2026.
  9. Wikipedia. St. Simons, Georgia (2020 Census figures). accessed Oct 4, 2026.
  10. Georgia EPD. Non-drought outdoor water use schedule (Water Stewardship Act). accessed Oct 4, 2026.
  11. Microsoft. Sustainable by design: Next-generation datacenters consume zero water for cooling. Dec 9, 2024.
  12. Georgia DOT. Traffic Analysis & Data Application (TADA): stations 127-0278, 127-0327, 127-0616, 127-0289. retrieved Oct 4, 2026.
  13. Georgia Ports Authority. Port of Brunswick again nation's busiest auto terminal. May 4, 2026.
  14. NOAA Office of Coast Survey. U.S. Coast Pilot 4, Chapter 12 (Intracoastal Waterway). Sep 27, 2026 ed..
  15. News4JAX. Everyone asked to stay off roads in Ware, Glynn counties as Hurricane Helene passes. Sep 27, 2024.
  16. Green Mountain Power. Energy Storage System Service tariff (effective Oct 1, 2026). 2026.
  17. VTDigger. Vermont regulators finalize 5.5% rate increase for Green Mountain Power customers. Sep 8, 2026.
  18. Glynn County Board of Elections. May 19, 2026 General Primary, Election Summary Report (party ballot questions). May 2026.
  19. Georgia Secretary of State. Glynn County results, May 19, 2026 General Primary. May 2026.
  20. WTOC. Effingham Co. School Board slashes tax rate to 16.45 mills in unanimous vote. Aug 31, 2026.
  21. Effingham County. Project Camellia (OpenAI Data Center). accessed Oct 4, 2026.
  22. Glynn County. Annual Comprehensive Financial Report, FY2025. 2025.
  23. Georgia Dept. of Audits & Accounts / UGA Carl Vinson Institute. Tax Incentive Evaluation: Georgia Data Center Sales & Use Tax Exemption. Dec 2025, rev. Jan 2026.
  24. Golf Course Superintendents Association of America. Golf Course Environmental Profile, Phase IV, Vol. I: Water Use and Conservation on U.S. Golf Courses. 2025.
  25. FEMA. National Flood Hazard Layer (queried with USGS 3DEP elevations). queried Oct 4, 2026.
  26. St. Simons Land Trust. Cannon's Point Preserve. accessed Oct 4, 2026.
  27. Southeastern Regional Transmission Planning (SERTP). 10 Year Transmission Expansion Plan (Brunswick–St. Simons and Brunswick–East Beach 115 kV lines). Dec 2011.
  28. Southeastern Regional Transmission Planning (SERTP). Preliminary 10 Year Transmission Expansion Plans. Jun 8, 2017.
  29. HIFLD / Esri Living Atlas. U.S. Electric Power Transmission Lines (queried for Glynn County). Oct 4, 2026.
  30. Georgia Public Service Commission. PSC approves rule to allow new power usage terms for data centers. Jan 23, 2025.
  31. Green Mountain Power. GMP's growing stored energy network delivers $6M in savings during July heat wave. Jul 28, 2026.
  32. National Laboratory of the Rockies (formerly NREL). PVWatts V8 model, queried for St. Simons Island. Oct 4, 2026.
  33. Utility Dive. Regulators approve Georgia Power's BYO clean resources plan for large loads. Apr 14, 2026.
  34. The Current. Anatomy of a secret Coastal Georgia data center deal. Aug 8, 2026.
  35. The Current. Citizen-led lawsuit challenges zoning for OpenAI Georgia data center. Sep 3, 2026.
  36. The Current. New lawsuit alleges unfair secrecy around Effingham data center. Sep 21, 2026.
  37. Atlanta Journal-Constitution. Coweta votes to turn this 800-acre forest into $17B data center campus. Apr 8, 2026.
  38. Statesboro Herald. Burkhalter Road data center project grew out of developers’ wish for alternative to apartments. 2026.
  39. FOX 5 Atlanta. Douglas County leaders just killed a massive data center project. Jul 2026.
  40. Rockdale Citizen. Covington mayor proposes to use Amazon revenues to eliminate property taxes. Jan 12, 2026.
  41. Covington News. Newton County to receive $1.125 million from Meta PILOT payment. May 3, 2024.
  42. Meta. Stanton Springs Data Center info sheet. accessed Oct 4, 2026.
  43. Atlanta Journal-Constitution. Data centers promise tax gains for Georgia. But are they delivering?. Jan 16, 2026.
  44. The Citizen. State reviewing massive Fayetteville data center plans. Sep 21, 2022.
  45. The Current. Data Centers & Coastal Georgia (collection: moratoria and lawsuits). 2026.
  46. Rome Floyd Development Authority (reposting Northwest Georgia News). Data center planned for 114 acres behind Coosa High School. 2025.
  47. WTOC. Bulloch County data center moratorium remains in place after commissioners deadlock on text amendment. Aug 5, 2026.
  48. Glynn County Tax Commissioner. 2025 and 2026 Millage Rates. Sep 2026.
  49. Georgia Dept. of Revenue. Real & Personal Property FAQs (40% assessment). accessed Oct 4, 2026.
  50. Georgia Dept. of Revenue. 2025 Summary of Ad Valorem Taxes Levied Report (Glynn, p. 32). Mar 31, 2026.
  51. Glynn County Schools. Board Briefs: June 10, 2025 (FY2026 budget). Jun 12, 2025.
  52. CitizenPortal (meeting summary). Glynn County Schools project $1.67 million shortfall in preliminary FY27 budget. Apr 15, 2026.
  53. National Center for Education Statistics. Common Core of Data: Glynn County district detail. 2024-25.
  54. JLL. 2026 Global Data Center Outlook. Jan 5, 2026.
  55. Georgia Dept. of Revenue. PT-50P Tangible Personal Property Tax Return and Schedules. rev. 2017.
  56. Atlanta Journal-Constitution. Microsoft aims to void property tax breaks for its data centers near Atlanta. Aug 6, 2026.
  57. Georgia Dept. of Revenue. Sales and Use Tax Rate Chart, effective October 1, 2026. 2026.
  58. Glynn County Capital Development. SPLOST: Special Purpose Local Option Sales Tax. accessed Oct 4, 2026.
  59. Glynn County Capital Development. St. Simons Island Gateway & Torras Causeway Improvements. accessed Oct 4, 2026.
  60. Independent analysis by the petition author. Glynn County SPLOST 2022 and ESPLOST III/IV dataset, compiled from county ACFRs, Georgia DOR sales tax distributions and BOE monthly ESPLOST status reports. through Aug 2026.
  61. Glynn County Board of Education. Schedule of Approved LOST Projects, ESPLOST III & IV, year ended June 30, 2024. 2024.
  62. Georgia State University Fiscal Research Center. Georgia Tax Expenditure Report for FY 2027 (item 4.06810). Jan 2026.
  63. Georgia General Assembly. HB 1291 (2022), as signed. 2022.
  64. News4JAX. What Glynn County voters will see on the 2024 ballots (ESPLOST V text). 2024.
  65. Glynn County Schools. ESPLOST (district page: ESPLOST funds cannot pay operating costs or salaries). accessed Oct 4, 2026.
  66. Golden Isles Development Authority. Glynn County incentives and tax abatements. Oct 16, 2025.
  67. Golden Isles Development Authority. Commercial Investment Policy. Oct 16, 2025.
  68. Glynn County Schools. 2026 millage rate notice (rollback rate 13.99 mills). Aug 2026.
  69. The Current. Coastal Georgia voters approve sales taxes, property tax relief. Nov 5, 2025.
  70. Lawrence Berkeley National Laboratory (Shehabi et al.). 2024 United States Data Center Energy Usage Report. Dec 2024.
  71. Andy Masley. The AI water issue is fake. Oct 11, 2025.
  72. Atlanta Journal-Constitution. Why a golf course going private is shaking life on a coastal Georgia island. Sep 15, 2026.
  73. Frederica. The Golf Club. accessed Oct 4, 2026.
  74. GolfPass. Sea Palms Golf & Tennis Resort. accessed Oct 4, 2026.
  75. Sea Island. Golf history. accessed Oct 4, 2026.
  76. Microsoft. Inside Microsoft's two-decade push to cut water intensity while scaling for growth. Jun 24, 2026.
  77. Georgia EPD. Pending applications, non-farm groundwater withdrawals (permit 063-0044). through Mar 31, 2016.
  78. Brunswick-Glynn County Joint Water and Sewer Commission. Water Department. accessed Oct 4, 2026.
  79. U.S. Geological Survey. SIR 2011-5087: Groundwater conditions in the Brunswick–Glynn County area, Georgia, 2009. 2011.
  80. Georgia EPD. Coastal Georgia Water & Wastewater Permitting Plan for Managing Salt Water Intrusion (presentation). Mar 2007.
  81. Georgia EPD. Notice of draft modified groundwater withdrawal permit 063-0003 (Brunswick Cellulose). Jun 17, 2026.
  82. Water & Wastes Digest. xAI commits to restarting Memphis wastewater recycling project in 2027. Jun 24, 2026.
  83. Bloomberg (via Yahoo Finance). Stargate's first data center site is size of Central Park. Jan 24, 2025.
  84. Epoch AI. OpenAI Stargate: where the US sites stand. Apr 20, 2026.
  85. One Hundred Miles. Glynn County zoning update. 2025.
  86. Glynn County GIS. Zoning feature service (St. Simons Island). Oct 4, 2026.
  87. Glynn County. Islands Planning Commission. accessed Oct 4, 2026.
  88. St. Simons Land Trust. Guale Preserve. accessed Oct 4, 2026.
  89. National Park Service. Monitoring at Fort Frederica National Monument. accessed Oct 4, 2026.
  90. Coastal Illustrated. Preserving a hidden gem (Musgrove). May 25, 2016.
  91. Land Advisors Organization. Sale of largest remaining zoned residential land on St. Simons Island completed. Dec 2021.
  92. Glynn County GIS. Parcels feature service (queried for the north end). Oct 4, 2026.
  93. Golden Isles News & Views (public Facebook group, ~24,000 members). Posts on Spur 25, Canal Road and causeway traffic, reviewed and paraphrased without names. Oct 4, 2026.
  94. The Brunswick News. County asks public to avoid major intersection starting next week. Mar 28, 2022.
  95. The Brunswick News. County, GDOT work to improve dangerous intersection. 2025.
  96. Georgia Ports Authority. Project cargo. accessed Oct 4, 2026.
  97. U.S. Department of Energy. Large Power Transformers and the U.S. Electric Grid. Jun 2012.
  98. NOAA Office of Coast Survey. U.S. Coast Pilot 4, Chapter 8. Sep 27, 2026 ed..
  99. Federation of American Scientists (U.S. Navy fact file). Landing Craft, Air Cushion. accessed Oct 4, 2026.
  100. Textron Systems. Ship-to-Shore Connector. accessed Oct 4, 2026.
  101. Griffon Hoverwork. BHT hovercraft. accessed Oct 4, 2026.
  102. Lockheed Martin / Sikorsky. CH-53K King Stallion achieves 27,000 pound external lift. Jun 23, 2016.
  103. Military.com. Marines' new King Stallion lifts 36,000 pounds in test. Mar 9, 2018.
  104. Erickson Inc.. S-64 Air-Crane fleet. accessed Oct 4, 2026.
  105. The Register. A closer look at Nvidia's 120kW DGX GB200 NVL72 rack system. Mar 21, 2024.
  106. TechCrunch. Elon Musk's SpaceX officially acquires Elon Musk's xAI. Feb 2, 2026.
  107. Federal Aviation Administration. SpaceX Starship Super Heavy at LC-39A, Final Environmental Impact Statement, Vol. I. Jan 2026.
  108. NOAA Office of Coast Survey. Distances Between United States Ports. 2026.
  109. Atlanta Journal-Constitution. Georgia bids land for SpaceX base in Camden County. 2013.
  110. The Current. Georgia Supreme Court upholds public vote to veto spaceport. Feb 7, 2023.
  111. Federal Communications Commission. Public Notice SES-02730: SpaceX Surrency (Appling County, GA) gateway license, 2024–2039. Dec 26, 2024.
  112. OpenStreetMap contributors. Power lines and substations, St. Simons Island (Overpass query; community-mapped, not confirmed by Georgia Power). queried Oct 4, 2026.
  113. Georgia Public Service Commission. Data Center Fact Sheet. Sep 2026.
  114. The Current. PSC boosts safeguards in Georgia Power's massive contract with OpenAI. Aug 27, 2026.
  115. WTOC. Georgia Power's OpenAI contract in Effingham County approved, expected to lower residential bills. Aug 26, 2026.
  116. Memphis Light, Gas & Water. Update regarding utility support for xAI. May 5, 2025.
  117. Greater Memphis Chamber. xAI Phase One Substation #63 providing 150MW of power to facility. 2025.
  118. Southern Environmental Law Center. Inside Memphis' fight against xAI. May 8, 2026.
  119. Georgia Dept. of Public Safety. Hurricane Matthew travel advisory. Oct 6, 2016.
  120. Atlanta Journal-Constitution. Georgia's barrier islands closed to public following Hurricane Matthew. Oct 8, 2016.
  121. Georgia Power (via PR Newswire). Georgia Power to restore power for nearly 100 percent of customers in Brunswick, Jesup, St. Simons and Jekyll Islands today. Oct 11, 2016.
  122. Glynn County (archived). Mandatory evacuation called for all of Glynn County. Sep 7, 2017.
  123. NOAA National Hurricane Center. Tropical Cyclone Report: Hurricane Irma (AL112017). 2018.
  124. FLETC (archived). Hurricane Irma update, 6:00 a.m., September 11, 2017. Sep 11, 2017.
  125. The Brunswick News. Infrastructure problems plague re-entry after Irma. Sep 14, 2017.
  126. News4JAX. Coastal Georgia counties close schools, set to evacuate. Sep 2, 2019.
  127. The Brunswick News. Idalia blows past Isles, causing wind damage, power outages. Aug 31, 2023.
  128. Action News Jax. Glynn County announces closures and recovery efforts amid power outages following Hurricane Helene. Sep 29, 2024.
  129. Vermont Public Utility Commission. Case 23-1335-TF, Final Order Approving Tariff Revisions (GMP energy storage). Aug 17, 2023.
  130. Green Mountain Power. GMP customers keep lights on with stored low carbon energy during storm outages. Nov 2018.
  131. EnergyChoiceMatters. Texas REP officially launches home battery backup program at Austin Energy. Jul 16, 2026.
  132. PG&E. PG&E, Rewiring America and Google launch first-of-its-kind virtual power plant. Sep 2026.
  133. Georgia Coalition of Local Governments. Post-hearing brief, PSC Dockets 56002/56003 (solar plus storage pilot incentives). Jul 3, 2025.
  134. EnergySage. Tesla Powerwall 3 review. May 15, 2026.
  135. Internal Revenue Service. FAQs for modification of sections 25C, 25D ... under Public Law 119-21. 2025.
  136. Census Reporter. St. Simons, GA (ACS 2020–2024). accessed Oct 4, 2026.
  137. BroadbandNow. Starlink deals and pricing. Aug 6, 2026.
  138. ESS News. Tesla unveils new generation of utility-scale batteries: Megapack 3 and Megablock. Sep 9, 2025.
  139. ESS News. Georgia Power's 2025 IRP: further shift towards battery storage. Feb 4, 2025.
  140. Iron Mountain (via PR Newswire). Iron Mountain announces the largest rooftop solar installation of any data center in the U.S.. 2019.
  141. EnergySage. Solar panel cost in Saint Simons Island, GA. Sep 25, 2026.
  142. Georgia Power. Plant Vogtle. accessed Oct 4, 2026.
  143. Microsoft Azure. Progress on our commitment to sustainable backup power in datacenters by 2030. accessed Oct 4, 2026.
  144. Data Centre Review. Digital Realty rolls out HVO at three US sites. Apr 15, 2024.
  145. Bureau of Ocean Energy Management. Georgia activities (offshore renewable energy). accessed Oct 4, 2026.
  146. Bellona. Floating nuclear power was a Russian curiosity. Now others want to give it a shot. Aug 2026.
  147. Federal Communications Commission. National Broadband Map: St. Simons CDP, fixed service at 100/20 Mbps (Dec 2025 data). updated Sep 29, 2026.
  148. NVIDIA. NVIDIA Ethernet networking accelerates world's largest AI supercomputer, built by xAI. Oct 28, 2024.
  149. Microsoft Local. Expanding Wi-Fi availability in rural Boydton and Clarksville, Virginia. 2019.
  150. Chalkbeat Tennessee. Memphis board approves Musk's xAI offer funding school repairs. Jul 30, 2025.
  151. City of Memphis. Weekly newsletter (xAI property tax and Community Benefit Ordinance). Jun 13, 2025.
  152. St. Simons Land Trust. Our history. accessed Oct 4, 2026.
  153. ProPublica Nonprofit Explorer. St. Simons Land Trust (IRS Form 990, FY2024). accessed Oct 4, 2026.
  154. St. Simons Land Trust. The Canopy Campaign. accessed Oct 4, 2026.
  155. Microsoft. Our 2024 Environmental Sustainability Report. May 15, 2024.
  156. The Citizen. Southern Conservation Trust launches 10-year forest restoration at Towaliga Preserve with QTS Data Centers. Oct 1, 2026.
  157. Rough Draft Atlanta. Google funds conservation in a Georgia watershed. Jun 5, 2026.
  158. The Current. Warnock calls for data center moratorium in Georgia. Aug 28, 2026.
  159. Action News 5. Musk to ship overseas power plant to Memphis to energize Colossus. Jul 7, 2025.